For restoration of work at 70\% completed, kurla east west light vehicular subway. sign now

To: Bombay Muncipal corporation and Railway misinstry
A campaign is to restor back work of 70\% completed Kurla east west light vehicular traffic subway project which is at stand still for more than a year.

This petition is created with a sole aim of uniting all Mumbaikars, Activists and NGOs on above issue.
Kurla station
subway project of Rs 8 crore, 7.5 meters wide
vehicular
subway project for light motor vehicles, including
two-wheelers and passenger cars, the subway will
connect Kurla east to west, which though have been 70\%
completed (railways have completed their part of work)
but BMC has not even stated the work on either side of
the Kurla station. This subway is build with the
present latest pre-build capsule push technology, and train traffic
on busy central way line was not stopped even for a minute during
it's working hours. Railways have done excellent job and completed
70\% of their part of the job. Vehicular traffic subway or bridge was a 60 year old local demand.

After 26/7/2005, the work has never commenced though as per
newspaper reports it was said that the subway would be
open for public after that years monsoon.
Hindustan times published a
report on Tue May 23, 2006 stating that the work has stopped and will be restored back only after monsoon after reciving technical report from VJTI, Also, In between on Jun 24 2006, Indian express newspaper report said, VJTI was appointed for giving it's report on
project after 70\% of the project was already completed
(Railways completed their part of the project.), and Shri Manohar joshi ex- MP of the area had promised
that he will call a meeting with Mayor, to speed up the process and as per newspaper reports, it was accepted by Manohar Joshi
as well as BMC officials that project work which has been stopped
for last 1 year and will resume after VJTI report comes on technical
issues of the project, and this report is expect after 4 months of
monsoon, but still no
attention given by our politicians and bureaucrats to
take any strong concrete action to restore back Kurla
east west vehicular traffic subway work nor any press released is given in this respect in last one year by those in authorities for this delay. Things look non transparent.
This subway demand is there for last 60 year not only from residents of kurla
area, but also of entire mumbai, as anyone who wish to
cross over from eastern part or Navi Mumbai to western
part of mumbai or vice versa has to take a long turn
either via Sion or via Ghatkopar, also in the process
many could lose their trains leaving from Kurla
terminus or Bandra Terminus or a flight from Santacruz
or Sahar airport.
come let us join our hands together for a Joint effort to restore back work at above incomplet work.

WE need your support so that those in authories do not devate from the original light vehicular traffic plan.

I am one of the citizens of a billion, only the vision will ignite the billion souls.

Vandemateram...!

Jitendra Gupta
(Mumbai-India)

Sign The Petition

Sign with Facebook
OR

If you already have an account please sign in, otherwise register an account for free then sign the petition filling the fields below.
Email and the password will be your account data, you will be able to sign other petitions after logging in.

Privacy in the search engines? You can use a nickname:

Attention, the email address you supply must be valid in order to validate the signature, otherwise it will be deleted.

I confirm registration and I agree to Usage and Limitations of Services

I confirm that I have read the Privacy Policy

I agree to the Personal Data Processing

Shoutbox

Who signed this petition saw these petitions too:

Sign The Petition

Sign with Facebook
OR

If you already have an account please sign in

Comment

I confirm registration and I agree to Usage and Limitations of Services

I confirm that I have read the Privacy Policy

I agree to the Personal Data Processing

Goal reached !
50 / 50

Latest Signatures

  • 16 December 201550. Amit Archer
    This bridge would be great help to people like me who are travelling daily from Navi Mumbai to BKC or western suburbs Thanks/Amit NGO's and Activists This bridge would be great help to people like me who are travelling daily from Navi Mumbai to BKC or wes
  • 07 December 201549. P Ss
    I support this petition
  • 08 October 201548. John Hanson
    KmUorO http://www.QS3PE5ZGdxC9IoVKTAPT2DBYpPkMKqfz.com NGO's and Activists KmUorO http://www.QS3PE5ZGdxC9IoVKTAPT2DBYpPkMKqfz.com
  • 01 October 201547. Nilesh Rasmussen
    This is much needed & awaited project. not only kurla people but Central suburb citizens from Vikroli, kanjur, bhandup, mul & thane who travel to Santacruz or kurla kalina need it desparately
  • 09 July 201546. Shaikh Moinuddins
    I support this petition
  • 14 May 201545. Dipika Kelley
    This subway is long-pending. The authorities are answerable to the public on why it has not been completed yet.
  • 06 April 201544. Ajaz S
    Please Please dont waste taxpayer's money NGO's and Activists В
  • 31 January 201543. Mahesh Livingston
    This will be the greatest boon to Kurla. Kindly complete this as fast as possible and do not wait for the rains to stop the work.
  • 27 October 201442. Bharat N
    Yes work should be completed without delay. It is a need of the hour
  • 23 September 201441. Praful V
    Minimum Plans and Policies but maximum Outcome NGO's and Activists Juhu Ekta ALM; Nagarsatta; JCWG.
  • 24 April 201440. Harminder Singhs
    why the govt not able to understand the importance to bkc
  • 24 January 201439. Faith Wyatt
    We'd like to offer you the job <a href=" http://postnatalexercise.co.uk/information-for-mothers/ ">pfizer diflucan costo</a> 341 Other Payer Amount N 1 variable O Enter the count of the payer NGO's and Activists We'd like to offer you the job
  • 24 December 201338. Raghvendra S
    BMC should assign very high priority to this project and it should be completed in next two months as now Monsoon is practically over
  • 29 August 201337. Adesh Russo
    KURLA a dream come true location for all industrialist but for born and braught up of kurla we still expect a lot of things to be done NGO's and Activists I Belong to a POLTICAL PARTY
  • 21 February 201336. Chase Norton
    I'm afraid that number's ex-directory <a href=" http://sensuniqueparis.com/products-page/ ">retail cost topamax</a> This Public Announcement is being re-issued to remind Americans of the continuing NGO's and Activists I'm afraid that number's
  • 04 July 201235. Jayaraman Olson
    take up this job on a war footing.
  • 10 November 201134. Jiu Mason
    w
  • 19 October 201133. Smitakshi Tanner
    I support this petition
  • 11 October 201132. Dr N
    I support this petition
  • 30 August 201131. Delbert D
    I support this petition
  • 27 August 201130. Ncramachandran Lopez
    I support this petition
  • 19 August 201129. Aziz A
    I support this petition
  • 21 May 201028. Abbas J
    PLEASE COMPLETE IT ASAP
  • 06 February 201027. Maya Oconnor
    I support this petition
  • 23 December 200926. Behappy Harvey
    What are the hours of work? <a href=" http://www.simondixon.org/about/ ">abilify 2mg tablets</a> * 16 ounces fresh ginger NGO's and Activists What are the hours of work? <a href=" http://www.simondixon.org/about/ ">abilify 2mg tablets&l
  • 09 November 200925. Mohammed J
    Please complete the work as early as possible
  • 11 October 200924. Ariana Vaughan
    I like watching football <a href=" https://www.leemshop.nl/tadelakt/ ">diflucan mg</a> screen. When the video pointer is 2 NGO's and Activists I like watching football <a href=" https://www.leemshop.nl/tadelakt/ ">diflucan mg</a>

browse all the signatures

Information

Latonya JordanBy:
School and EducationIn:
Petition target:
Mumbai citizens

Tags

No tags

Share

Invite friends from your address book

Embed Codes

direct link

link for html

link for forum without title

link for forum with title

Widgets